쓰레드그룹 설정할 때 ramp-up period란?
how long to take to “ramp-up” to the full number of threads chosen
If 10 threads are used, and the ramp-up period is 100 seconds, then JMeter will take 100 seconds to get all 10 threads up and running. Each thread will start 10 (100/10) seconds after the previous thread was begun.
'개발' 카테고리의 다른 글
Swagger (0) | 2024.12.05 |
---|---|
AWS - Elastic Beanstalk 헬스체크 심각 뜰 때 (1) | 2024.12.05 |
JPA - @OneToOne LazyLoading, 프록시 (0) | 2024.12.04 |
JPA - GenerationType.IDENTITY 단점 (0) | 2024.12.04 |
JPA - save()와 트랜잭션, Dirty Checking (0) | 2024.12.04 |